Cleanliness & Sanitation – Section 23(2)(i) | OSHWC Code 2020

access_time 2025-12-28T17:00:25.135Z face OME
Cleanliness & Sanitation – Section 23(2)(i) | OSHWC Code 2020 CLEANLINESS & SANITATION (Section 23(2)(i) – OSHWC Code 2020 – Mine Workers Rules) 1.1 INTRODUCTION Section 23(2)(i) places a legal obligation on the to maintain complete cleanliness & sanitation in the mine premises. Cleanliness is treat...

Highwall Mining Safety Hazards & DGMS Circulars – DGMS Exam Notes

access_time 2025-11-06T10:24:09.183Z face Online Mining Exam
Highwall Mining Safety Hazards & DGMS Circulars – DGMS Exam Notes 🧠 Detailed Notes 1️⃣ Major Hazards in Highwall Mining Highwall mining combines surface and underground operations, creating specific hazards that must be monitored closely. Key hazards include: Slope Failure / Highwall Collapse – due...

Highwall Mining – DGMS SSR Preparation & Approval Process

access_time 2025-11-05T12:00:51.921Z face Online Mining Exam
Highwall Mining – DGMS SSR Preparation & Approval Process 📘 Introduction Highwall Mining operations require comprehensive slope stability assessment and approval from DGMS before commencement. The SSR (Slope Stability Report) is a mandatory technical document prepared by a qualified geotechnical ex...

Highwall Mining Equipment & Cutter Module Design – DGMS Exam Notes

access_time 2025-11-03T18:23:12.795Z face Online Mining Exam
Highwall Mining Equipment & Cutter Module Design – DGMS Exam Notes Introduction Highwall Mining (HWM) is a remote-controlled, surface-based mining system used to recover coal from final highwalls in opencast mines. It bridges the gap between opencast and underground mining, enabling economic recover...

Design & Construction Parameters of Box Cut (DGMS Guidelines)

access_time 2025-11-01T21:29:08.587Z face Online Mining Exam
Design & Construction Parameters of Box Cut (DGMS Guidelines) Introduction The box cut is the first excavation in an opencast mine, providing entry for heavy earth-moving machinery (HEMM). A well-designed box cut ensures: Safe initial access, Efficient haulage, Proper drainage, and Long-term slope s...