🧾 DETAILED NOTES
1️⃣ Introduction
Roof bolting is the primary support system in Indian underground coal and metalliferous mines. Resin capsules are widely used as a rapid-setting, high-strength grouting material for anchoring roof bolts. DGMS has revised standards to ensure higher bonding strength, quality consistency, better shelf-life, and improved safety against roof falls.
2️⃣ Resin Capsule – Composition
A resin capsule consists of:
- Outer polyester film
- Two-component system inside:
- Resin (polyester/epoxy)
- Catalyst/Hardener (benzoyl peroxide)
On rotation of the bolt, both components mix and polymerize, forming a solid high-strength grout.
3️⃣ Revised DGMS Standards (Key Points)
1. Capsule Dimensions & Packaging: Diameter must match the hole diameter (32 mm, 27 mm, etc.). Length as per bolt requirement (250 mm, 400 mm, 600 mm). Package must be clearly labelled with Manufacturer, Batch number, Expiry date, and Strength rating.
2. Physical & Chemical Testing Requirements:
- Viscosity & Gel Time: Must comply with IS/ISO standards. Gel time limits: Fast-set (10–20 sec), Slow-set (1–3 min).
- Compressive Strength: Test cubes must meet minimum compressive strength at 1 hour and 24 hours.
- Shelf-Life Test: Must retain strength up to 12 months. Temperature-controlled storage required.
3. Pull-Out Test (Load Test): Each batch must undergo Pull-Out Testing. Minimum pull load should meet DGMS requirement (typically ≥ 10 tonnes). Recommended frequency: Monthly, After receipt of new batch, Post-long storage.
4️⃣ Installation Standards
Hole Drilling: Diameter as per bolt + capsule size; Smooth hole (no over-drilling); Hole must be clean & dry.
Bolt Installation: Insert resin capsule → Push bolt to end → Rotate bolt to mix resin → Hold until setting time → Torque the nut after curing.
5️⃣ Storage & Handling Standards
- Store below 25°C.
- Keep capsules away from sunlight.
- Avoid mechanical damage.
- FIFO (First In First Out) rule.
6️⃣ Advantages of Resin Capsules
- Rapid setting → immediate roof support
- Suitable for wet & dry strata
- Higher bond strength than cement grouts
- No shrinkage
- Long-term stability
7️⃣ Common Failures
Improper mixing, damaged capsules, expired capsules, water-filled holes, incorrect hole diameter, or wrong rotation speed.
⚡ QUICK ONE-LINERS (Revision Points)
- Resin capsules contain resin + catalyst.
- Gel time defines setting speed.
- Pull-out test checks anchorage strength.
- Capsules must be batch-marked with expiry.
- DGMS requires resin testing before use.
- Wet holes reduce bonding strength.
- Shelf-life: usually 12 months.
- Bolt rotation mixes resin & hardener.
- Pull-test load should meet DGMS norms.
- Storage temperature must be controlled.
🧠 DESCRIPTIVE MODEL Q&A
Q. Explain the revised DGMS standards for testing and use of resin capsules in roof bolting.
Answer:
DGMS mandates that resin capsules used for roof bolting must be tested for gel time, compressive strength, viscosity, and shelf-life as per approved IS/ISO standards. Each batch must undergo pull-out tests to verify anchorage strength. Capsules must be stored properly, labelled with batch details, and used before expiry. The hole must be drilled to correct dimensions, and resin must be properly mixed by bolt rotation to achieve full strength. These standards ensure safe and reliable roof support in underground mines.
🧮 25 MCQs
Q1. Resin capsules are used for:
Q2. Resin capsule contains:
Q3. Gel time indicates:
Q4. Pull-out test checks:
Q5. Fast-set resin typically sets in:
Q6. Resin capsules must be stored below:
Q7. Expired resin capsules:
Q8. Hole must be:
Q9. Label must include:
Q10. Resin capsule outer layer is:
Q11. Mixing occurs when bolt is:
Q12. Strength test done at:
Q13. Shelf-life of resin capsules:
Q14. Pull-test frequency:
Q15. Resin bonding is affected by:
Q16. DGMS tests resin capsules for:
Q17. Resin used for:
Q18. Resin-hardeners are:
Q19. Over-drilling leads to:
Q20. Capsules must be:
Q21. Main purpose of resin capsule:
Q22. Resin testing follows:
Q23. Capsule diameter depends on:
Q24. FIFO ensures:
Q25. Resin capsule failure may cause:
🔗 INTERNAL LINKING SUGGESTIONS
| Related Topic | Read More On... |
|---|---|
| Roof Bolting | Roof Bolt Support System Notes |
| Strata Control | Strata Monitoring in Longwall Workings |
| DGMS Circulars | DGMS Tech Circulars |
| Support Rules | CMR 2017 Part 2 - Working & Supervision Rules |
🏗️ Master Roof Bolting Safety & DGMS Standards!
Get 100+ mining safety blogs, MCQs & notes at Online Mining Exam.
- Detailed Resin Capsule Notes
- Pull-Test Procedures
- DGMS Circular Explanations
🌐 Visit: www.onlineminingexam.com
📞 Call/WhatsApp: 9971114020