🚧 DGMS Field Trial Process – Eligibility, Monitoring & Compliance (Based on DGMS Approval Policy – Second Revision 2016) Before any new mining equipment is allowed full approval, DGMS may require a Field Trial to verify its safety, performance, strength, and reliability under actual mine conditions. This blog explains exact DGMS field trial rules, responsibilities of mine management & manufacturer, reporting formats, and approval workflow β€” in complete OME style.

πŸ”Ή 1. What is a DGMS Field Trial?

A DGMS Field Trial is a supervised trial of new equipment in a working mine to check:
  • Safe performance
  • Reliability under mining conditions
  • Compatibility with existing systems
  • Compliance with safety features
  • User feedback
  • Hazard identification
Field trials validate that equipment tested in laboratory also performs safely in real-world underground or opencast mines.

πŸ”Ή 2. When Are Field Trials Required?

DGMS orders field trials when equipment is:
  • New technology not used previously in India
  • Imported equipment requiring validation
  • Modified FLP or IS equipment
  • New safety devices
  • Heavy machinery with powered systems
  • Explosion-protection systems
  • Automation systems
Example items:
  • Battery Electric Vehicles (BEVs)
  • New flameproof motors
  • Digital gas detectors
  • Proximity Warning Systems
  • New explosives/detonators
  • Automation packages (CMS, PWS)

πŸ”Ή 3. Types of DGMS Field Trials
Type Description Duration
Type A Underground coal mines 3–12 months
Type B Opencast mines 1–6 months
Type C Rescue & safety equipment 1–3 months

πŸ”Ή 4. Process Flow of DGMS Field Trials

Manufacturer β†’ Submit Field Trial Application ↓ DGMS Scrutiny & Provisional Approval ↓ Installation at Mine β†’ Commissioning ↓ Monitoring by Mine + Manufacturer + DGMS ↓ Periodical Reports Submitted ↓ Final Evaluation β†’ DGMS Approval/Modification/Rejection

πŸ”Ή 5. Step-by-Step Field Trial Procedure

⭐ Step 1: Application Submission Manufacturer submits:
  • Form N (Provisional Approval)
  • Technical dossier
  • Hazardous area classification
  • Safety certifications (Ex/IS/BIS)
  • Factory QMS certificates
  • SOP for installation
  • Service & spares support commitment

⭐ Step 2: DGMS Review & Provisional Approval DGMS issues:
  • Permission for installation
  • Conditions of trial
  • Safety instructions
  • Special precautions
  • Hazard controls
Provisional approval validity: 6–12 months

⭐ Step 3: Installation & Commissioning in the Mine Mine management must:
  • Install equipment at designated zone
  • Ensure compliance with DGMS conditions
  • Provide manpower, supervision & safety arrangements
  • Maintain trial logbook
Manufacturer must:
  • Provide technical experts
  • Train mine staff
  • Provide safety instructions & manuals

⭐ Step 4: Monitoring During Field Trial Monitoring is done jointly by: 

  βœ” Mine Management
  • Daily performance
  • Faults & failures
  • Operator feedback
βœ” Manufacturer
  • On-site engineer
  • Maintenance & troubleshooting
  • Performance tuning
βœ” DGMS
  • Surprise inspections
  • Safety compliance checking
  • Cross-verification of reports

πŸ”Ή 6. Data Collected During Field Trial 

 During the trial, the following data must be recorded:
  • Running hours
  • Failure frequency
  • Temperature data
  • Gas concentration limit compliance (for FLP/IS)
  • Mechanical strength
  • Battery performance (for BEVs)
  • Electrical safety compliance
  • Noise & vibration
  • Safety alarms
  • Operator ergonomics
  • Spare parts requirement
  • Fuel/energy consumption

πŸ”Ή 7. Mandatory Field Trial Reports Manufacturers must submit: 

  ⭐ Fortnightly Report Includes:
  • Site conditions
  • Performance data
  • Fault logs
  • Hazard observations
⭐ Quarterly Report Contains:
  • Technical evaluation
  • Safety findings
  • Recommendations
  • Rectification work summary
⭐ Final Field Trial Report Must include:
  • Full performance data
  • Safety compliance statement
  • Failure analysis
  • Final drawings (if modified)
  • Mine manager’s performance certification
  • DGMS inspection remarks

πŸ”Ή 8. Responsibilities of Stakeholders

⭐ Manufacturer Responsibilities
  • Provide installation & commissioning
  • Ensure safety compliance
  • Provide field engineer
  • Maintain spare parts & servicing
  • Submit all reports timely
  • Make design corrections (if needed)

⭐ Mine Management Responsibilities
  • Ensure safe operation
  • Maintain trial logbook
  • Report failures immediately
  • Provide fire-fighting & safety arrangements
  • Allow DGMS inspection
  • Ensure training to operators

⭐ DGMS Responsibilities
  • Inspect trial sites
  • Verify data authenticity
  • Enforce compliance
  • Approve / modify / reject equipment

πŸ”Ή 9. Completion of Field Trial

After successful trial: DGMS may grant:
  • Full approval
  • Conditional approval
  • Approval with modifications
Or reject the equipment if:
  • Unsafe
  • Performance is unreliable
  • Violates Ex/IS safety conditions

πŸ”₯25 MCQs (DGMS Style) with Answers

1) Field trials are required for β€” 

a) Cement bags
b) Clothes
c) New mining equipment
d) Normal tools
e) None
Ans: c

2) Provisional approval for field trial is valid for β€” 

a) 1 month
b) 5 years
c) 6–12 months
d) Unlimited
e) None
Ans: c

3) Field trial application form β€”

a) Form K
b) Form B
c) Form N
d) Form L
e) None
Ans: c

4) Field trial monitoring is done by β€”

a) Manufacturer only
b) Mine only
c) Mine + Manufacturer + DGMS
d) Outsiders
e) None
Ans: c

5) Underground trials typically last β€”

a) 1 day
b) 1 week
c) 3–12 months
d) 10 years
e) None
Ans: c

6) Final field trial report submitted by β€”

a) Worker
b) Labour union
c) Manufacturer
d) Accountant
e) None
Ans: c

7) DGMS may reject trial if β€”

a) Product is good
b) Site is clean
c) Equipment unsafe
d) Operator trained
e) None
Ans: c

8) Field trial failure must be reported β€”

a) Weekly

b) Immediately
c) Annually
d) During renewal
e) None
Ans: b

9) Provisional approval is granted by β€”

a) State govt
b) Labour office
c) DGMS
d) Mines Board
e) None
Ans: c

10) BEV underground requires field trial because β€”

a) Colour
b) Price
c) New technology & safety test
d) Wheels
e) None
Ans: c

11) Data required in trials includes β€”

a) Rainfall
b) Temperature of equipment
c) Performance, failures, safety data
d) Salary
e) None
Ans: c

12) Field trial reports submitted β€”

a) Monthly only
b) Annually only
c) Fortnightly + Quarterly + Final
d) Every 5 years
e) None
Ans: c

13) DGMS ensures β€”

a) Cost reduction
b) Increased production
c) Safety compliance
d) New products only
e) None
Ans: c

14) Trial logbook maintained by β€”

a) Clerk
b) Visitor
c) Mine management
d) Driver
e) None
Ans: c

15) Flameproof equipment trial checks β€”

a) Colour

b) Length
c) Gas ignition & safety
d) Fuel
e) None
Ans: c

16) Operator feedback is part of β€”

a) Survey report
b) Trial report
c) Daily wages
d) CMR
e) None
Ans: b

17) DGMS may conduct β€”

a) Surprise inspections
b) No inspections
c) Annual picnic
d) GST audits
e) None
Ans: a

18) Failure in safety conditions leads to β€”

a) Party
b) Reward
c) Trial rejection
d) Promotion
e) None
Ans: c

19) BEV trial especially checks β€”

a) Tyres only
b) Battery safety & charging
c) Steering
d) Paint
e) None
Ans: b

20) Hazard observations are documented in β€”

a) Police report
b) Field trial report
c) Gate pass
d) Ledger
e) None
Ans: b

21) Field trials validate β€”

a) Cost
b) Sales
c) Real-world safety
d) Colour
e) None
Ans: c

22) Field trials help ensure DGMS β€”

a) Labour policy
b) Picnic schedule
c) Compliance before approval
d) Road tax
e) None
Ans: c

23) Major stakeholders are β€”

a) Driver
b) Cleaner
c) DGMS + Mine + Manufacturer
d) CISF
e) None
Ans: c

24) During trial, failures must be β€”


a) Ignored
b) Rectified immediately
c) Stored
d) Deleted
e) None
Ans: b

25) After successful trial DGMS may grant β€” a) Prize
b) Leave
c) Full approval
d) Shutdown
e) None
Ans: c

                     πŸ”š Conclusion 

The DGMS Field Trial process ensures that new mining equipment is safe, reliable, and fully compliant before entering Indian mines. Field trials:

  • Validate real-world performance
  • Prevent accidents
  • Ensure safe technology adoption
  • Avoid unsafe equipment in underground mines
Understanding these rules is essential for manufacturers, mine managers, and safety officers.

πŸš€πŸ“˜ Download DGMS Field Trial Notes at OnlineMiningExam.com
πŸ“ Practice 10,000+ DGMS MCQs
πŸ”” Join our OME Telegram Channel for daily mining updates


{{ONLINEMININGEXAM.COM}}
India's 1st Online Mining Academy Prepare for DGMS 1st Class & 2nd Class Mining Manager......


/* Banner container */ #omxBanner { position: fixed; left: 50%; bottom: -120px; /* hidden initially */ transform: translateX(-50%); width: min(980px, calc(100% - 20px)); max-width: 980px; background: linear-gradient(90deg,#0f172a,#0b84ff); color: #fff; border-radius: 12px 12px 8px 8px; padding: 11px 14px; /* reduced (80%) */ box-shadow: 0 12px 30px rgba(3,10,30,0.45); display: flex; gap: 10px; align-items: center; z-index: 2000; transition: bottom 450ms cubic-bezier(.2,.9,.3,1), transform 250ms; font-family: system-ui, -apple-system, "Segoe UI", Roboto, "Helvetica Neue", Arial; } /* Show class slides banner up */ #omxBanner.show { bottom: 20px; } /* Left: icon / logo */ #omxBanner .left { flex: 0 0 51px; /* 80% of 64px */ height: 51px; border-radius: 6px; background: linear-gradient(135deg,#00d4ff,#0077ff); display:flex; align-items:center; justify-content:center; font-weight:700; color:#002; font-size:16px; /* reduced */ } /* Middle: text */ #omxBanner .center { flex: 1 1 auto; min-width: 0; } #omxBanner .center h4 { margin: 0 0 3px 0; font-size: 13px; /* reduced */ line-height: 1.1; letter-spacing: 0.2px; } #omxBanner .center p { margin: 0; font-size: 11px; /* reduced */ opacity: 0.95; } /* Right: CTA & close */ #omxBanner .right { display:flex; gap:6px; align-items:center; } #omxBanner .cta { background: linear-gradient(90deg,#ffb703,#fb8500); color: #07122a; border: none; padding: 8px 11px; /* reduced */ border-radius: 6px; font-weight: 700; cursor: pointer; text-decoration: none; font-size: 12px; /* reduced */ box-shadow: 0 6px 14px rgba(251,133,0,0.22); } #omxBanner .cta:active { transform: translateY(1px); } #omxBanner .closeBtn { background: transparent; border: none; color: rgba(255,255,255,0.9); font-size: 16px; /* reduced */ cursor: pointer; padding: 4px; line-height:1; } /* Mobile tweaks */ @media (max-width:600px) { #omxBanner { flex-direction: column; gap:6px; align-items:flex-start; padding:9px; bottom: 10px; width: calc(100% - 18px); left: 50%; transform: translateX(-50%); } #omxBanner .left { display:none; } #omxBanner .right { width:100%; justify-content: space-between; } #omxBanner .cta { width:48%; text-align:center; padding:8px 6px; font-size:11px; } }