DGMS Documentation Requirements – Test Reports, QMS, Factory Certificates & Technical Files | DGMS Notes


🗂️ DGMS Documentation Requirements – Test Reports, QAR/QAN, Factory Certificates & Technical Files 

Every manufacturer seeking DGMS approval must submit a complete technical file.
This file ensures that equipment is:
  • Safe
  • Tested
  • Certified
  • Traceable
  • As per standard designs
This blog explains exact DGMS documentation requirements for FLP, IS, electrical, mechanical & safety equipment — written in simple OME format.

🔹 1. Why Documentation Is the Backbone of DGMS Approval? 

 Documentation ensures:

✔ Correct design
✔ Compliance with BIS/IEC/ATEX/IECEx
✔ No shortcuts in manufacturing
✔ Factory quality control
✔ Traceability
✔ Safe installation DGMS rejects applications with incomplete or incorrect documents.

🔹 2. Core Components of a DGMS Technical File 

 A complete DGMS technical file includes 8 major parts:

⭐ 1) Application Forms (Form B / Form C / Form N) Used for:
  • New approval (Form B / C)
  • Provisional approval (Form N)
Must be:
  • Signed
  • Sealed
  • With all annexures

⭐ 2) Technical Drawings Drawings must include:
  • GA drawing
  • Cross-sectional views
  • Dimensional tolerances
  • Material specifications
  • Bill of materials
  • Flamepath drawings (for FLP)
  • PCB drawings (for IS devices)
  • Wiring diagrams
Drawings must be:
  • Properly numbered
  • Revision-controlled
  • Signed by design authority

⭐ 3) Test Reports (From DGMS Approved Labs) Tests required (depending upon equipment): For FLP Equipment
  • Flame transmission
  • Temperature rise
  • Internal explosion test
  • Impact/pressure test
  • Surface temperature test
For IS Equipment
  • Spark ignition tests
  • Thermal testing
  • Fault condition testing
  • ExTR (IECEx Test Report)
For Electrical Machinery
  • HV test
  • Insulation test
  • IP test
  • Load test
  • ELCB test
Reports must be:
  • Original
  • On lab letterhead
  • Signed & stamped
Acceptable labs include:
  • CIMFR
  • CPRI
  • ERTL/ETDC
  • BIS labs
  • International ExCB (for IECEx/ATEX)

⭐ 4) Quality System Certificates (QAR / QAN) QAR – Factory Quality Audit Verifies:
  • Calibration
  • Traceability
  • Testing equipment
  • Inspection records
QAN – International Quality Compliance Required for:
  • IECEx
  • ATEX

⭐ 5) BIS License & Compliance Certificates Required for:
  • FLP (IS/IEC 60079-1)
  • IS (IS/IEC 60079-11)
  • Cables (IS 1554/7098)
  • PPE (IS 2925 / 15298)
Must include:
  • Valid license copy
  • Renewal certificate
  • Annual surveillance report

⭐ 6) Factory Documents These include:
  • ISO 9001 certificate
  • Factory layout
  • Production flow chart
  • QC process
  • Calibration register
  • Material inspection records
DGMS cross-verifies these during factory audits.

⭐ 7) User Manuals & Installation Instructions Must include:
  • Operating procedure
  • Safety precautions
  • Do’s & Don’ts
  • Maintenance schedule
  • Installation steps
  • Troubleshooting

⭐ 8) Performance Reports (Field Data) Required when:
  • Renewal of approval
  • Modified design
  • Provisional approval
Reports must include:
  • Mines where equipment installed
  • Running hours
  • Failures & rectification
  • Safety events
  • User feedback

🔹 3. DGMS Documentation Submission Workflow 

Manufacturer/IAR ↓ Document Preparation ↓ Application Submission online/offline ↓ DGMS Scrutiny ↓ Ask for clarifications (if any) ↓ Testing + Factory Audit ↓ Field Trial (if required) ↓ Final Approval (Form K)

🔹 4. Common Reasons DGMS Rejects Applications

❌ Missing flamepath drawing
❌ Invalid BIS certificate
❌ Expired QAR/QAN
❌ Test reports older than 2 years
❌ Drawing mismatch with production model
❌ False or forged documents
❌ Incomplete annexures
❌ Wrong hazardous zone certification

🔹 5. Checklist for DGMS Documentation (Full Compliance)
Document Mandatory
Application (Form B/C/N)
Flameproof drawings
IS circuit diagrams
ExTR (IECEx) Optional/Import
BIS license
QAR/QAN
Factory QC process
Routine test reports
User manual
Performance report Renewal only
Authorization letter (for imports)
CMR compliance declaration

🔹 6. Documentation Required for Imported Equipment 

Overseas manufacturers must additionally provide:

  • Authorization letter
  • IECEx / ATEX certificate
  • QAR/QAN
  • Indian testing reports
  • Calibration certificates
  • Service support plan in India

🔥25 MCQs (DGMS Pattern) with Answers

1) Flamepath drawings are required for —

a) IS equipment
b) FLP equipment
c) PPE
d) Civil tools
e) None
Ans: b

2) DGMS approval issued in —

a) Form X
b) Form K
c) Form L
d) Form P
e) None
Ans: b

3) QAR stands for —

a) Quantity Approval Rate
b) Quality Assurance Report
c) Quick Audit Requirement
d) Quality Action Register
e) None
Ans: b

4) ExTR relates to — 

a) Transport
b) Explosion Test Report (IECEx)
c) Excavation report
d) Daily log
e) None
Ans: b

5) BIS license required for —

a) Civil items
b) FLP/IS equipment
c) Food processing
d) MMS
e) None
Ans: b

6) User manual must include —

a) Office staff names
b) Safety & operating instructions
c) Coal prices
d) Balance sheet
e) None
Ans: b

7) Field performance report required during —

a) First application
b) Festival
c) Renewal
d) Painting
e) None
Ans: c

8) Factory audit required for —

a) GST returns
b) QAR submission
c) Cafeteria inspection
d) Payroll
e) None
Ans: b

9) DGMS rejects application if —

a) Drawings signed
b) All documents complete
c) Fake certificate submitted
d) Factory passes QC
e) None
Ans: c

10) Imported items require —

a) Only BIS
b) Only ATEX
c) Authorization letter + IECEx/ATEX + Indian testing
d) No documents
e) None
Ans: c

11) QMS certificate for manufacturer —

a) ISO 45001
b) ISO 14001
c) ISO 9001
d) ISO 31000
e) None
Ans: c

12) DGMS testing labs include —

a) Zoo
b) CIMFR/ERTL/CPRI
c) Hotel
d) Office
e) None
Ans: b

13) Drawings must be —

a) Handwritten
b) Revision controlled
c) Blank
d) Verbal
e) None
Ans: b

14) Routine test reports required —

a) Monthly
b) With every approval submission
c) Annually
d) Optional
e) None
Ans: b

15) IAR required for —

a) Indian companies
b) Private mines
c) Overseas manufacturers
d) Domestic buyers
e) None
Ans: c

16) Calibration certificates are required for — a) Switchgear
b) Gas detectors
c) Sensors
d) All of these
Ans: d

17) SIS testing applies to —

a) Shoes

b) IS circuits
c) Tracks
d) Civil tools
e) None
Ans: b

18) Technical file must contain —

a) Song lyrics
b) All drawings and reports
c) Photos only
d) Bills
e) None
Ans: b

19) Missing flamepath dimension leads to — a) Warning
b) Delay
c) Rejection
d) Promotion
e) None
Ans: c

20) Authorization letter must be —

a) Verbal
b) On OEM letterhead
c) Sticker
d) Code
e) None
Ans: b

21) DGMS approval requires —

a) Colour certificate
b) Safety test reports
c) Fuel documents
d) Employee list
e) None
Ans: b

22) IS circuits must limit —

a) Temperature
b) Voltage
c) Current
d) All of these
Ans: d

23) Coal Mines Regulation for electricity —

a) Reg. 105
b) Reg. 131–138
c) Reg. 200
d) Reg. 10
e) None
Ans: b

24) Performance report submitted by —

a) Worker
b) Accountant
c) Manufacturer/IAR
d) DGMS clerk
e) None
Ans: c

25) Purpose of DGMS documentation —

a) Decoration
b) Marketing
c) Verify safety, quality & compliance
d) Reduce paperwork only
e) None
Ans: c

🔚 Conclusion 

Documentation is the core of DGMS approval.
A complete technical file ensures:
  • Proven safety
  • Verified design
  • Reliable performance
  • Factory quality
  • Legal compliance
Manufacturers, IARs, and mining engineers must understand these requirements to avoid rejection and ensure safe equipment in mines.

🚀  📘 Download DGMS Documentation Notes at OnlineMiningExam.com
📝 Practice 10,000+ DGMS MCQs
🔔 Join OME Telegram Channel for daily DGMS updates


{{ONLINEMININGEXAM.COM}}
India's 1st Online Mining Academy Prepare for DGMS 1st Class & 2nd Class Mining Manager......


OUR COURSES View More

/* Banner container */ #omxBanner { position: fixed; left: 50%; bottom: -120px; /* hidden initially */ transform: translateX(-50%); width: min(980px, calc(100% - 20px)); max-width: 980px; background: linear-gradient(90deg,#0f172a,#0b84ff); color: #fff; border-radius: 12px 12px 8px 8px; padding: 11px 14px; /* reduced (80%) */ box-shadow: 0 12px 30px rgba(3,10,30,0.45); display: flex; gap: 10px; align-items: center; z-index: 2000; transition: bottom 450ms cubic-bezier(.2,.9,.3,1), transform 250ms; font-family: system-ui, -apple-system, "Segoe UI", Roboto, "Helvetica Neue", Arial; } /* Show class slides banner up */ #omxBanner.show { bottom: 20px; } /* Left: icon / logo */ #omxBanner .left { flex: 0 0 51px; /* 80% of 64px */ height: 51px; border-radius: 6px; background: linear-gradient(135deg,#00d4ff,#0077ff); display:flex; align-items:center; justify-content:center; font-weight:700; color:#002; font-size:16px; /* reduced */ } /* Middle: text */ #omxBanner .center { flex: 1 1 auto; min-width: 0; } #omxBanner .center h4 { margin: 0 0 3px 0; font-size: 13px; /* reduced */ line-height: 1.1; letter-spacing: 0.2px; } #omxBanner .center p { margin: 0; font-size: 11px; /* reduced */ opacity: 0.95; } /* Right: CTA & close */ #omxBanner .right { display:flex; gap:6px; align-items:center; } #omxBanner .cta { background: linear-gradient(90deg,#ffb703,#fb8500); color: #07122a; border: none; padding: 8px 11px; /* reduced */ border-radius: 6px; font-weight: 700; cursor: pointer; text-decoration: none; font-size: 12px; /* reduced */ box-shadow: 0 6px 14px rgba(251,133,0,0.22); } #omxBanner .cta:active { transform: translateY(1px); } #omxBanner .closeBtn { background: transparent; border: none; color: rgba(255,255,255,0.9); font-size: 16px; /* reduced */ cursor: pointer; padding: 4px; line-height:1; } /* Mobile tweaks */ @media (max-width:600px) { #omxBanner { flex-direction: column; gap:6px; align-items:flex-start; padding:9px; bottom: 10px; width: calc(100% - 18px); left: 50%; transform: translateX(-50%); } #omxBanner .left { display:none; } #omxBanner .right { width:100%; justify-content: space-between; } #omxBanner .cta { width:48%; text-align:center; padding:8px 6px; font-size:11px; } }